Outdoor Fixed Installation Factory Suppliers Manufacturers Quotes

LED Control System LED Display Screen Solution Provider

Outdoor Fixed Installation

LED display connection sketch map:

1. Preparation of Installation Tools

①M10x60MM Screw
②M10x20MM Screw
③M10 Hexagon Wrench
④110x50MM connecting piece
⑤110x110MM connecting piece
⑥Z type connecting piece




2. Cabinets’ Connection and Fixation

Notes: pay attention to keeping the assembling in the same level when assembling the first row cabinets, otherwise, the more stacked up, the lager gap. After putting the first cabinets on the steel structure, please screw up the installation iron sheet (i.e.installation borads) and 40﹟ steel structure with corresponding screws but not be too tight in order to adjust the level line. When confirm all the cabinets are in the same level, you can tighten them.


                                 The Z board connection on the sides


                                 The flat board connection in the module


                                    The flat board connection on the bottom



                                              The full view after installation



Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
Message